Production Monitoring System Using SCADA Platform

SSCN Number   : SSCN-0005
Project Number  : FASMY-1905-011
Solution   : Production Monitoring System
Industries   : Automotive

Problem Statement

- Customer existing using other brands of controller to connect with Mitsubishi PLC for visualization.

- The controller is not consolidating in a single platform, different access required for the visualization.

Solutions

- Removed the third party controller and replace with Mitsubishi MC Works64 Scada Platform.

- The SCADA will directly be connected to all the PLC on the production line at 4 factories.

Results

- All the information will be directly pulled and store at SCADA Server. The data storage is increase and real-time monitoring via a single platform for the end-user.

- The reporting system is suited to production needs compare to previous.